Soiltek S60

Soiltek

S60

Piling rig

For piling under bridges, viaducts and low structures

1,000 m

Max diameter

26 m

Max depth

16 t

weight

Soil Tek S60 Piling Works Under Concrete Viaduct

At a glance

What the S60 can do on your site

Technical Specifications

Figures are manufacturer maximums. What’s achievable on a job depends on the tooling and the ground.

Suitable applications

  • CFA piles under structures
  • Bored piles, low headroom
  • Down-the-hole drilling
  • Confined parts of big sites

Site access

Craneable into sites bigger rigs cannot enter. Worked under 5.5 m of clearance at The Ribbon.

About this rig

Overview

The Soiltek S60 is the rig we use when headroom decides the job. Its mast is built in sections and can be assembled in three lengths, so the crew sets it to the clearance on the day. The shortest configuration has a minimum height of about 5.2 m.

At The Ribbon Hotel development for Multiplex, the S60 drilled CFA piles up to 11 m deep under a concrete viaduct with 5.5 m of clearance. A rig with a fixed mast could not have done that job. At Kemps Creek for Hansen Yuncken, it worked alongside the SR-45 and took the confined sections while the larger rig handled the open ground.

The S60 weighs about 16 t and develops around 65 kNm of torque. It drills bored piles, CFA and down-the-hole, and it can be craneable into sites where a larger machine cannot get in. Bored capacity is up to 1,000 mm in diameter and 26 m deep, CFA is up to 600 mm and 11 m [CONFIRM the bored figures with Len].

The limit is size. For large-diameter or very deep piles we move to the Soilmec SR-45, and for headroom below the S60’s range we use the Tescar CF3.

Transport and Set-Up

Contact the team to find out more detail about this machine.

On site

The S60 at work

Why this rig

Key features

  • Segmented mast, three lengths for different headroom
  • Works under bridges and viaducts
  • Bored, CFA and down-the-hole drilling
  • Craneable into restricted sites
  • About 65 kNm torque

FAQs

S60 questions

How does the Soiltek S60 get onto a site that larger rigs cannot enter?
It is craneable, so it can be lifted into sites with no ramp or platform access.
Yes. At Kemps Creek it took the confined sections while the SR-45 worked the open ground, so one contractor covered both.
It has down-the-hole capability for harder ground.

Not sure which rig suits your site?

Send through your details and a few words about the project, and a member of our team will reach out to talk through your site and the right rig for the job.

The Fleet

Other rigs in the fleet

Camera placeholder image

Tescar

CF3

For tight, low-headroom sites and sensitive surfaces

Camera placeholder image

Tamrock

Ranger 700

For anchor and soil nail holes through rock

Soil Tek S60 Piling Works Under Concrete Viaduct

Soiltek

S60

For piling under bridges, viaducts and low structures