Aerial view of a piling rig and excavators on a sandy beachfront block between neighbouring homes, with the road below

At a glance

What the R210 can do on your site

Technical Specifications

Figures are manufacturer maximums. What’s achievable on a job depends on the tooling and the ground.

Suitable applications

  • CFA piles in sand
  • Contiguous shoring walls
  • Residential foundations
  • Retaining wall piles

Site access

Suits narrow residential blocks. Worked a sloping beachfront lot between neighbouring homes.

About this rig

Overview

The Soilmec R210 is a dual-purpose rig that drills both CFA and rotary bored piles. We use it on residential and narrow commercial sites where the platform is small and a larger rig would be overkill.

On CFA work it drills up to 750 mm in diameter and 15.3 m deep, with a rotary head of around 100 kNm. It switches to a kelly bar for bored piles, and the bored diameter and depth depend on the kelly bar fitted.

Our recent job at Wamberal on the Central Coast shows what it suits. The block was a sloping beachfront lot between neighbouring homes, and the ground was water-charged sand. An open bore slumps in sand below the water table, so we used CFA, where the auger holds the hole open until the concrete is pumped. The R210 drilled 128 CFA piles at 450 mm and 600 mm, up to 14.3 m deep, and formed a contiguous shoring wall plus the foundations for both levels. The crew started on 26 August 2026 and finished on 29 September.

For deeper or larger-diameter work we move to the Soilmec SR-45. For restricted headroom we move to the Soiltek S60 or Tescar CF3.

Transport and Set-Up

Contact the team to find out more detail about this machine.

On site

The R210 at work

Why this rig

Key features

  • Dual-purpose CFA and bored piling
  • CFA piles to 750 mm and 15.3 m
  • Rotary head torque around 100 kNm
  • Suits narrow residential and beachfront blocks
  • Proven in water-charged sand at Wamberal

FAQs

R210 questions

Why use CFA piles instead of open bored piles in beach sand?
Sand below the water table slumps into an open bore as the tool comes out, so the pile cannot form cleanly. CFA keeps the hole supported by the auger until the concrete is pumped. That is why we used it for the 128 piles at Wamberal.
When the site is too small or the pile specification too modest for the larger rig, such as narrow residential blocks.
Yes. At Wamberal the same rig drilled the contiguous shoring wall, both levels of foundations, the retaining wall piles and the stair piles.

Not sure which rig suits your site?

Send through your details and a few words about the project, and a member of our team will reach out to talk through your site and the right rig for the job.

The Fleet

Other rigs in the fleet

Camera placeholder image

Tescar

CF3

For tight, low-headroom sites and sensitive surfaces

Camera placeholder image

Tamrock

Ranger 700

For anchor and soil nail holes through rock

Soil Tek S60 Piling Works Under Concrete Viaduct

Soiltek

S60

For piling under bridges, viaducts and low structures